Hall Upgrades

 
2017
Brings a much needed upgrade to the exterior of the facility. Keep your eyes peeled for this modern exterior upgrade designed by "De La Fuente Design". Additionally, the maintenance committee will continue to plan for the development of an outdoor kitchen/BBQ area that will be available as a rental space. 
 
2016
Brought the hall great things. The rink shack door was replaced, a sum pump was installed in the crawl space, mud jacking corrected the slumped concrete surrounding the building and the roof was replaced. Thank you Justin, Barb, Ryan & the committee for your contributions.
 
2015
In the summer of 2015 the board installed new ceiling tiles, the new ceiling tiles were picked specifically to assist with managing the echo in the hall. Thank you to Yvonne for researching and selecting the right product and thank you to all the volunteers that helped with the install.
 

 

2014
In the summer of 2014 the board completed some much needed work on the hall. The interior and exterior lighting was been replaced, additional lights were installed in areas that were dark around the building. A message board was installed at the main entrance, you can find information about upcoming events at the hall and around the community. Both furnaces and the hot water tank were replaced, and new flooring was installed. Thank you to Justin for organizing this work.

 

membership

events

hallrentals

Low/No Cost Activities